Skip to main content

Gemini 3 Flash Tutorial: Build a UI Studio With Function Calling

Learn how to use Gemini 3 Flash to create a UI Studio that assembles dashboards via tool calls, structured outputs, and rapid knob-based iteration.
· 10 min read

Explore with AI

Most AI dashboard builder demos follow the same pattern, where the user passes a prompt, the model generates a massive chunk of UI code, and the user then spends the rest of their time fixing broken layouts, missing states, and half-wired components.

This tutorial takes a different approach. We’ll build UI Studio, a tool-calling dashboard factory where Gemini 3 Flash coordinates 100 UI components as callable tools. 

Instead of writing one big React file, Flash sequences small, structured steps like creating a navbar, adding filters, binding data to a table, generating insight charts, and exporting a single UISpec JSON file. It performs a step-by-step process while the UI updates as each step completes.

By the end, you’ll have a studio-like app that can generate multiple dashboard templates (Customer Feedback Triage, Sales Pipeline, SRE Incident Command, Finance Spend Tracker, Product Analytics Funnel, and more) and iterate quickly to another view mode, theme, and more. 

Note: This demo serves as a foundation; feel free to refine the prompts to better align with your specific goals and output preferences

If you want to learn more about building AI Agents using the Google ecosystem, I recommend checking out the course, Building AI Agents with Google ADK. I also recommend our guide to Gemini 3.8 Flash.

What Is Gemini 3 Flash?

Google’s Gemini 3 Flash model is built for speed-first, agentic workflows where you don’t want a single perfect answer, but a tight iteration loop like build, inspect, tweak, and rebuild. Flash mimics Gemini 3 Pro reasoning with Flash-level latency, efficiency, and cost, making it a strong fit for high-frequency interactive apps. 

Gemini 3 Flash Benchmarks

Source: Gemini 3 Flash DeepMind 

Two things that make Flash relevant for builder apps like UI Studio include:

  • It’s designed to execute numerous structured steps reliably, rather than delivering a single, comprehensive response.
  • It also supports structured outputs,  function calling,  code execution, and search as a tool, which lets us keep the entire pipeline deterministic and inspectable.

In theory, Gemini 3 Flash (preview) supports 1M input tokens and 64K output tokens, which are useful when the build trace and UISpec get large. 

Gemini 3 Flash Architecture 

Gemini 3 Flash is the agentic workflow model in the Gemini 3 family, which is tuned for low-latency, high-throughput applications where you need rapid iterations, tool use, and multi-step plans. Here are some key features of this model:

  • Reasoning levels (thinking_level): Gemini 3 Flash exposes a thinking_level setting (minimal, low, medium, high), which we can trade off for latency/cost vs depth. This setting is perfect for UI builds where most steps are routine, but some need deeper planning.
  • Tool use: Gemini 3’s tool use is designed for multi-step loops where the model emits tool calls, we execute them, feed results back, and it continues until the turn is complete. This is exactly what we want for a studio UI that updates in real time as the build progresses.
  • Thought signatures: Gemini 3 uses encrypted thought signatures to preserve reasoning context across turns. The tool loop must pass them back exactly as received, or function calling can fail(4xx/400 validation error), even at thinking_level="minimal".
  • Multimodality: Gemini 3 Flash accepts text, code, images, audio, video, and PDFs as inputs. On Vertex AI, we can tune media_resolution to trade off multimodal cost vs latency, and even return multimodal tool outputs when we need tighter control.

Gemini 3 Flash Example: Build a UI Studio Dashboard

In this section, we’ll build UI Studio from a single prompt using Gemini 3 Flash. The app assembles UIs via tool calls and outputs an exportable UISpec JSON.

At a high level, the final app will:

  • Display a Template Catalog like Customer Feedback Triage, Product Analytics Funnel, Sales Pipeline, and more.
  • Let the user click Start Build to trigger a tool-calling build loop where Flash composes the dashboard step-by-step.
  • Render the generated dashboard in Preview Mode, alongside a UISpec inspector and an execution trace.
  • Export the final dashboard spec as JSON.
  • Support fast iteration with simple prompts like compact density, dark mode, default sort by SLA risk, or switch to kanban.

Gemini 3 Flash Project Dashboard

Prompt overview

In this section, we’ll look into the prompt used to build the UI Studio in Google AI Studio with Gemini 3 Flash. Instead of generating a dashboard in one shot, Flash runs as the brain of the studio. It coordinates tool calls, validates and repairs outputs, and produces a single renderable artifact. 

Here is the prompt that I used for this demo:

SYSTEM / DEVELOPER PROMPT — Gemini 3 Flash (UI STUDIO ORCHESTRATOR)
You are UI_STUDIO_ORCHESTRATOR inside an app called “UI Studio”.
Goal: Build a reusable “dashboard builder studio” that can generate many different dashboards (Sales, Support, Ops, Finance, Product Analytics, etc.) by orchestrating 80–150 callable UI component tools (agents). 
Each UI component (navbar, cards, table, filters, auth, charts, drawers, modals, etc.) is represented as a tool/function that returns structured JSON. 
You must reliably sequence many tool calls and output a valid UISpec JSON that renders the Studio UI and the generated dashboards.
HIGH-LEVEL BEHAVIOR
UI Studio itself is a dashboard-like app (the “builder”), not just a single dashboard.
Users can select a dashboard type/template to build (e.g., “Customer Feedback Triage”, “Sales Pipeline”, “SRE Incident”, “Finance Spend”, “Product Analytics”).
The Studio exposes a catalog of components (count ~100) and a tool registry (count 80–150), plus specialized agents for different template families.
Gemini 3 Flash must:
Render the UI Studio builder UI
Provide template selection and “Start Build” for a chosen dashboard
Use different specialist agents for different dashboard templates
Assemble the requested dashboard via many component tool calls
Iterate rapidly based on feedback (A/B knobs)
ABSOLUTE RULES
TOOL-FIRST: Build everything via tools. Do not “describe” UIs in prose.
MANY CALLS: On first build, make 30–80 tool calls. This is expected.
STRUCTURED OUTPUT ONLY: Final response must be ONE valid JSON object (UISpec). No markdown or commentary.
VALIDATE + REPAIR: Always run validate_uispec and repair until ok=true.
CONSTRAINTS: Only call enabled tools and only instantiate allowed components (if lists are provided).
ITERATION: Patch minimal deltas using update tools; preserve stable IDs.
INPUTS YOU RECEIVE (RunContext)
The user (or the app) provides a JSON RunContext each run:
{
"studioGoal": string,
"selectedTemplate": string | null,
"requestPrompt": string,
"knobs": { ... },
"allowedComponents": string[],
"enabledTools": string[],
"availableTemplates": string[] | null,
"agents": [{ "name": string, "role": string, "specialty": string }]
}
Use this as the constraints. If missing, assume reasonable defaults and proceed.
TOOLS AVAILABLE (CONCEPTUAL)
You can call tools returning JSON. Only call tool names included in enabledTools.
set_agent_status(agentName, status, note) -> ok
emit_trace(eventName, payload) -> ok
list_templates() -> { templates: TemplateMeta[] }
choose_template(userIntent) -> { templateId, rationale }
define_data_model(domain, templateId, constraints) -> DataModel
compose_layout(layout_type, regions, responsive_rules) -> LayoutSpec
create_component(type, variant, region, intent, theme_tokens, data_contract, constraints) -> ComponentSpec
update_component(component_id, patch) -> ComponentSpec
bind_data(component_id, bindings) -> BindingSpec
define_workflow(name, steps, triggers) -> WorkflowSpec
validate_uispec(uispec) -> { ok: boolean, issues: Issue[] }
repair_uispec(uispec, issues) -> UISpec
create_ab_variant(base_uispec, knob_changes) -> { variants: [{name, uispec}], metricPlan }
save_template(templateId, uispec) -> ok
export_dashboard(uispec, format) -> { artifactRef }
UISPEC OUTPUT CONTRACT (STRICT)
Return ONE JSON object:
{
"app": { "name": "UI Studio", "description": string, "routes": [...] },
"theme": { "mode": "light"|"dark", "density": "compact"|"comfortable", "tokens": {...} },
"studio": {
"templateCatalog": TemplateMeta[],
"selectedTemplate": string|null,
"componentCatalog": { "count": number, "items": string[] },
"toolRegistry": { "count": number, "items": string[] },
"agents": [{ "name": string, "role": string, "specialty": string }]
},
"dataModel": DataModel,
"layout": LayoutSpec,
"components": ComponentSpec[],
"workflows": WorkflowSpec[],
"states": { "loading": {...}, "empty": {...}, "error": {...} },
"generatedDashboards": [
{ "templateId": string, "name": string, "uispecRef": string }
],
"abTests": [ ... ] // optional
}
UI STUDIO BUILDER UI (MUST INCLUDE)
The Studio UI must include:
A) Header + Hero Banner
Title “UI Studio”
Subtitle: “Build dashboards via function-calling components”
Buttons: “Start Build”, “Iterate”, “Export”
B) REQUESTS (cards like “Orders”)
Preset request cards (Easy/Intermediate/Difficult) for different dashboard types
“Add New Request” card
Each request card has Start + status
C) COMPONENTS panel (count ~100)
Searchable list of UI components (navbar, cards, table, filter, auth, charts, drawer, modal, etc.)
Allow/prefer/disable toggles (optional)
Shows count
D) TOOLS panel (count 80–150)
Searchable list of callable tools/functions
Shows call counters for the current run and “recently called”
Shows count
E) AGENTS panel
3–8 specialist agent cards (all powered by Flash, but role-separated):
Template Selector Agent (chooses dashboard template from user intent)
IA/UX Planner Agent (information architecture)
Data Modeler Agent (schemas + bindings)
Component Composer Agent (creates component specs)
Chart Builder Agent (insights widgets)
QA/A11y Gatekeeper Agent (validation + fixes)
Experimentation Agent (A/B variants + knobs)
Agent cards show status: Idle / Working / Waiting / Done
F) Preview Drawer
Tabs: Preview | UISpec JSON | Trace
Preview renders either the Studio or the generated dashboard spec
TEMPLATE SYSTEM (MUST INCLUDE)
Provide at least 8 templates in templateCatalog with metadata:
id, name, category, difficulty, primaryComponents, dataEntities, defaultKnobs
Examples:
customer_feedback_triage
sales_pipeline
support_ticket_ops
sre_incident_command
finance_spend_tracker
product_analytics_funnel
marketing_campaign_performance
inventory_warehouse_ops
Selecting a template should:
set selectedTemplate
populate default knobs
drive which specialist agents become active
drive which components/tools are preferred during build
A/B KNOBS (FIRST-CLASS)
Studio must support knob-driven iterations:
density: compact|comfortable
navigation: topbarOnly|leftRail
defaultSort: template-specific enum
viewMode: table|inboxList|kanban|gridCards
insightFocus: overviewFirst|triageFirst|trendsFirst
themeMode: light|dark
BUILD ALGORITHM
When user requests “create UI studio …” (this message), you must:
emit_trace("start_studio_build", {...})
set_agent_status(...) as you plan/build/validate
Create the UI Studio builder UI (sections A–F above) via MANY create_component calls
Define templateCatalog and agent roster
Implement template selection workflow:
choose_template from user intent
build_dashboard workflow that triggers component creation for the chosen template
Implement “Start Build” workflow:
picks template
defines dataModel
composes layout
creates components for the generated dashboard
validates + repairs
stores in generatedDashboards with uispecRef
validate_uispec and repair until ok
Output ONLY the UISpec JSON
ITERATION BEHAVIOR
If user later asks: “build a Sales dashboard” or “change to dark mode, compact density”:
update Studio state (selectedTemplate/knobs)
call update_component and rebuild only the generated dashboard region
re-validate and output updated UISpec JSON only
NOW EXECUTE
User intent: Create a UI Studio that can build numerous dashboards, with 100 UI components as callable tools/agents, dashboard selection, and specialist agents for different templates.
Start building immediately via tools, then output a single valid UISpec JSON.

The goal of the prompt is to enforce a predictable build loop so Gemini 3 Flash behaves like a builder, not a chatbot. For this, the prompt should include:

  • An explicit target for tool usage on the first build, usually 30 to 80 tool calls, so Flash breaks the UI into many small component-building steps instead of generating one big output.
  • A mandatory validate then repair loop until the spec passes to guarantee that the final UISpec is renderable and prevents broken states.
  • Patch-style updates during iteration to preserve component IDs and avoid full rebuilds. This keeps the UI stable across edits and makes iterations fast.
  • A high-level UISpec contract covering theme, layout, components, bindings, workflows, states, template catalog, agents, and trace. This gives Flash a strict target format so every build produces a consistent, structured artifact.
  • A template catalog and assign specialist agent roles, so each dashboard type starts with defaults like layout, knobs, and preferred components, and Flash can split the work across planning, building, and validation.

This works because the model outputs a single structured UISpec that you can validate, fix with small patches, and update quickly without rebuilding the entire UI.

Project overview

Even though Gemini 3 Flash generates the entire codebase for this demo, it still helps to understand what each file is responsible for. There is a clear separation between the Studio UI, the preview dashboard, and the Gemini API layer. Once you know where the two AI loops live, the rest of the repository becomes easy to follow.

Google Gemini 3 Flash Project File structure

Here’s the high-level flow of how the UI Studio app triggers Gemini 3 Flash and renders the generated dashboard:

  • When the app loads, App.tsx opens the Studio view and pulls the initial template catalog, tool registry, component catalog, and agent list from mockData.ts.
  • Template selection is handled entirely in client-side state at this stage, so no Gemini request is triggered yet.
  • When you click Start Build, the app clears the previous run trace, switches to a “building” state, and starts updating agent cards and trace events to make progress visible.
  • After the staged UI updates, the app makes the main build request through services/geminiService.ts.
  • The model’s JSON response is parsed into a UISpec, stored in state, and the UI switches into Preview mode.
  • In Preview, the generated dashboard is rendered using standard React components such as tables, filters, and insights.
  • PreviewDrawer.tsx acts as an inspector panel where you can view the UISpec JSON and basic build stats.
  • A second Gemini loop lives inside DetailDrawer.tsx and runs at the individual row level.
  • When a user opens a feedback item and requests AI help, analyzeFeedback() and suggestResolution() in geminiService.ts call Gemini again to produce structured classification and recommended actions.
  • Overall, the app runs two pipelines, one for building the dashboard spec and one for assisting users within the dashboard.

If you are interested in other key project files for understanding how the demo is wired, here’s some further detail:

Root directory

These files define the project setup, type contracts, and seed data that keep the demo consistent and runnable.

  • package.json: Defines dependencies and scripts where we see React, Recharts, and the @google/genai SDK, along with dev scripts like vite, build, and preview.
  • tsconfig.json: This contains the TypeScript compiler settings for React and bundler resolution. It keeps the project type-safe without emitting compiled TS during development.
  • vite.config.ts: Vite dev and build config, including port setup and environment wiring. This file maps GEMINI_API_KEY into process.env.API_KEY, so the GenAI SDK can read it in the browser build.
  • metadata.json: App metadata is used by the AI Studio for hosting. It gives the app a name, description, and required permissions.
  • types.ts: This acts as the contract layer for the entire app, which defines types for templates, agents, tools, feedback rows, and the UISpec shape so the UI and model outputs remain consistent.
  • mockData.ts: This file contains seed data for the Studio and Preview experience. It defines the template catalog, initial agent roster, tool registry, and mock feedback rows so the UI works even before any model call.

Services(services/)

This layer contains the Gemini integration and is where all model calls and structured responses are handled.

  • geminiService.ts: It has three core calls: the orchestrateBuild() function to generate a UISpec, and analyzeFeedback(), suggestResolution() function calls to power AI assistance.
  • Note: orchestrateBuild() currently targets gemini-3-pro-preview, while the other two calls use gemini-3-flash-preview, so you would swap this if you want the entire demo to be Flash-only.

Studio UI components(components/)

These React components render the Studio builder UI and the generated dashboard preview, including the JSON inspector and detail flows.

  • StudioHeader.tsx: This helps to render the Studio header and start building the CTA. It reflects the build state, so the user sees when the pipeline is running.
  • TemplateCatalog.tsx: It shows template cards and lets the user select what dashboard they want to build. The selection updates the local state in App.tsx.
  • AgentPanel.tsx: Agent panel displays “specialist agents” as status cards. In this demo, the status progression is driven by staged updates in App.tsx to make the workflow visible.
  • ToolPanel.tsx: The Tool Panel helps to render the tool registry list from mockData.ts. It is the UI placeholder for showing tool availability and call counters.
  • ComponentPanel.tsx: This is the UI representation of “components as tools,” and it is the natural place to add allow/deny toggles later.
  • PreviewDrawer.tsx: It lets you view the UISpec JSON and basic stats, which makes the build trace debuggable.
  • Topbar.tsx: This file holds the dashboard top navigation and search bar. It demonstrates how dashboard-level controls can exist alongside the studio-level knobs.
  • Sidebar.tsx: It handles the left rail navigation for the rendered dashboard.
  • FilterBar.tsx: This acts as a filter strip used to slice feedback data. 
  • FeedbackTable.tsx: This is the main table view for feedback items, where clicking a row triggers selection and opens the detail drawer experience.
  • DetailDrawer.tsx: It calls analyzeFeedback() and suggestResolution() and renders the model output under the AI tab.
  • InsightsSection.tsx: This file helps in rendering charts and summary insights view using Recharts.

Here is a short demo video that walks through the full UI Studio workflow, including template selection, the Start Build flow, and the generated dashboard preview:

Conclusion

In this tutorial, you used Gemini 3 Flash to build UI Studio by chaining many small, structured function calls, much like the actual dashboard building process. This was, however, refined through assembling, validating, previewing, and iterating, rather than generating one big React file.

The key takeaway is to treat UI components as tools, keep a single UISpec JSON as the source, and enforce a validate-then-repair loop so every build stays renderable and debuggable. 

If you want to take this demo  forward:

  • Replace the simulated tool counters with a true tool loop where each component is a callable function, and every call is logged into the trace
  • Persist template outputs so users can save, fork, and compare UISpec variants
  • Connect the preview dashboards to real data sources
  • Add automated checks (schema validation, accessibility linting, snapshot diffs), so the validate/repair loop becomes measurable.

To keep learning, I recommend checking out our Google Antigravity tutorial and the guide to using the Gemini 3 API. 

Gemini 3 Flash FAQs

Why choose Gemini 3 Flash over Gemini 3 Pro for this dashboard builder?

Gemini 3 Flash is optimized for high-frequency agentic loops. In a "studio" app where a user might drag a slider and expect an immediate UI update, Flash’s lower latency feels more responsive than Pro. Additionally, since building a dashboard might require 50–100 sequential tool calls, Flash’s significantly lower cost per token makes the "tool-first" architecture economically viable compared to running the heavier Pro model for every small update.

Can Gemini 3 Flash actually handle a 1M token context window?

es. Gemini 3 Flash supports a 1 million token input context, which is essential for this UI Studio architecture. As your dashboard grows and the "build trace" (the history of every tool call, validation error, and patch) gets longer, the context window allows Flash to "remember" the reason behind a specific component choice made 50 steps ago. This prevents the model from hallucinating or overwriting previous work as the session gets long.

Does Gemini 3 Flash support multimodal tool outputs?

Yes. Unlike previous generations that mostly returned text/JSON, Gemini 3 Flash can generate multimodal outputs via tools. For a dashboard builder, this means you could theoretically have a tool that returns a generated SVG icon, a specialized chart image, or even a PDF export of the UISpec directly from the model, rather than just code that renders it.

Why treat UI components as tools instead of asking Flash to generate React code?

We treat UI components as tools because dashboards are iterative. Tool calls let you:

  • build incrementally
  • Update only what changed
  • preserve stable IDs
  • validate everything continuously

This is far more reliable than rewriting whole files.

How do I add a new dashboard template?

To add a new dashboard template, create a new template entry in mockData.ts that includes a unique template ID, a name, and a difficulty level. After that, update the TemplateCatalog.tsx file so the new template appears in the UI and can be selected. Finally, update geminiService.ts to pass the selected template’s context and defaults to the orchestrator call so Gemini can generate a dashboard spec that matches the new template.

How do I scale from 100 components to 150 tools?

Split your tools into clear categories such as layout tools, component creation tools, data binding tools, QA and validation tools, and experimentation tools for A/B variants. Each tool should stay small and deterministic so it returns a predictable JSON fragment. The orchestrator’s job is simply to sequence these tools and stitch the results into a final UISpec.

What should the validation step actually check?

Validation should check the following:

  • Verify that the UISpec matches the expected JSON schema.
  • Detect missing or invalid required component props.
  • Catch broken or incomplete data bindings.
  • Flag invalid event handlers.
  • Ensure all required layout regions are populated.

Even these basic checks can significantly improve reliability.

How do I keep iteration fast?

You can keep iterations fast by using knobs and patch-based updates:

  • If the user asks for compact density, you should update only the table and card components that change sizing.
  • If the user asks for a dark theme, you should update only the theme tokens rather than touching the component structure.
  • If the user asks for a kanban view, you should replace only the table component with a kanban component and preserve the rest.

Avoid rebuilding from scratch unless the layout truly needs a full reset.

Aashi Dutt

Author

Aashi Dutt

I am a Google Developers Expert in ML(Gen AI), a Kaggle 3x Expert, and a Women Techmakers Ambassador with 3+ years of experience in tech. I co-founded a health-tech startup in 2020 and am pursuing a master's in computer science at Georgia Tech, specializing in machine learning.

Topics

Related